Well, I figured I better post an update on the basement, since I haven't done one for a little while. (Mostly because they haven't done too much.) So they put in the wood laminate floor where our kitchen will be on the back of the room. I think it looks very slick. They did an excellent job installing it. On the right wall near the bottom you can see the radient heating duct (we're still not sure if that was the right thing to do, I sure hope it heats the room very well). They also installed the ducts in the two bedrooms. I hope they clean them up a bit, they don't look very child friendly at the moment : /

The cabinets for our kitchen arrived. We looked at the front of them a little bit and I think they look great. I hope they don't blend in with the flooring that we chose too much.
We're vast approaching the second completion date that they gave us (Jan 14). But, given that they still need to repaint the hallway and bedrooms, finish putting the molding on the walls, install all the carpet, finish the radient heating, and install my currently non-existent surround sound speaker connections (grrrrr, we only asked them about it 10+ times before they put up the drywall). We're not holding our breath for them to finish on time.